The SCEAS System
Navigation Menu

Conferences in DBLP

IFIP WG5.7 Publications (ifip5-7)
1992 (conf/ifip5-7/1992)

  1. H. J. Pels, John C. Wortmann
    Integration in Production Management Systems: An Integrating Perspective. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:1-12 [Conf]
  2. Egbert-Jan Sol
    CIM - Communication and Information in Manufacturing. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:13-21 [Conf]
  3. G. Arngrímsson, Johan Vesterager
    STEP: Experiences from Actual Use of the Standard. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:23-35 [Conf]
  4. Ulf Hordvik, Roland Oehlmann
    Support of Collaborative Engineering Through a Shared High Level Product Model - Basic Requirements and Concepts. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:37-51 [Conf]
  5. Paul Schönersleben, Hendrik Oldenkott
    Enlarging CAD and Interfaces Beween PPC and CAD to Respond to Product Configuration Requirements. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:53-69 [Conf]
  6. A. Bottema, L. van der Tang
    A Product Configurator as Key Decision Support System. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:71-92 [Conf]
  7. F. J. Erens, H. Hegge, E. A. van Veen, John C. Wortmann
    Generative Bills-of-Material: An Overview. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:93-113 [Conf]
  8. Cláudio Walter, Otto Ries
    A Data Modeling Framework for OKP Design and Management. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:115-126 [Conf]
  9. Jos J. M. Trienekens
    Quality Mangement in Software Production, a Customer Oriented Approach. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:127-135 [Conf]
  10. Heiko Nordloh, Peter Knackfuß, Volker Wiehle, Bernd E. Hirsch
    Integrated System for Almost Automatic Generation of Production Planning Data for Sheet Metal Manufacturing. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:137-146 [Conf]
  11. Dieter K. Hammer
    Lean Information Management: The Integrating Power of Information. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:147-163 [Conf]
  12. Kari Tanskanen, Erri Lindquist, Pentti Aalto
    Vendor Rating System for Just-in-Time Manufacturing. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:165-174 [Conf]
  13. Luuk Kornelius, Coen Kreuwels, Piet van der Vlist
    Aspects of the External Integration of Production Management Systems with EDI. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:175-182 [Conf]
  14. J. H. M. van der Drift
    Integrating Factory and Cell Control. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:183-198 [Conf]
  15. Edward Raosinski, Tom R. Wielicki
    i-DSS - Instructional Decision Support System for Teaching Production/Operation Management. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:199-211 [Conf]
  16. J. Will M. Bertrand, John C. Wortman, Jacob Wijngaard
    A Framework for Production Control and Materials Management. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:213-222 [Conf]
  17. Jacques Arektion, Joel Laget, J. P. Kieffer, Henri Seban, André Hughes
    Integration of Information Systems: Man-Machine Interface in Decision Making Process. Conceptual Model for an Intelligent Terminal. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:223-233 [Conf]
  18. Patric Timmermans, Chris Kearns
    Modular Design of a Scale Model Factory. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:235-256 [Conf]
  19. Paolo Brandimarte, Mario Calderini
    Integrated Process Planning and Shop Scheduling by Local Search Algorithms. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:257-276 [Conf]
  20. Wil M. P. van der Aalst
    Modelling and Analysis of Complex Logistic Systems. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:277-292 [Conf]
  21. R. M. Kerr
    An Integrated Decentralised Production Management System. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:293-305 [Conf]
  22. Arjen A. A. den Boer
    Integration of Information in Logistic Operation. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:307-321 [Conf]
  23. Allan S. Carrie, R. MacIntosh
    UK Research in Manufacturing Systems Integration. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:323-336 [Conf]
  24. P. Eringfeld
    Market-Driven Manufacturing: A Case Example Integration of Functinos, Differentiation Between Processes. [Citation Graph (0, 0)][DBLP]
    Integration in Production Management Systems, 1992, pp:337-352 [Conf]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002