The SCEAS System
Navigation Menu

Conferences in DBLP

IFIP WG5.7 Publications (ifip5-7)
1993 (conf/ifip5-7/1993b)

  1. Klaus Fischer
    Knowledge-based Reactive Scheduling in a Flexible Manufacturing System. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:1-18 [Conf]
  2. Brian J. Garner, G. J. Ridley
    Application of Neural Network Process Models in Reactive Scheduling. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:19-28 [Conf]
  3. Paddy Jordan, Jim Browne, Mary Browne
    Production Activity Control for Small Manufacturing Enterprises. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:29-38 [Conf]
  4. Jürgen Dorn, Roger Kerr, Gabi Thalhammer
    Reactive Scheduling in a Fuzzy-Temporal Framework. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:39-56 [Conf]
  5. Günter Schmidt
    How to Apply fuzzy Logic to Reactive Production Scheduling. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:57-68 [Conf]
  6. Hubert Mulkens
    Revisiting the Johnson Algorithm for Flow-Shop Scheduling with Genetic Algorithms. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:69-80 [Conf]
  7. Prasad Raja, Luis Ruiz, J. Hernandez, Guevara Noubir, Marc Riese
    Scheduling for Absolute Temporal Consistency. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:81-92 [Conf]
  8. Stephen F. Smith, Ora Lassila
    Configurable Systems for Reactive Production Management. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:93-106 [Conf]
  9. Katia P. Sycara, Kazuo Miyashita
    Adaptive Schedule Repair. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:107-124 [Conf]
  10. Elizabeth Szelke, G. Márkus
    Reactive Scheduling - An Intelligent Supervisor Function. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:125-146 [Conf]
  11. Migar M. C. Tam, Doris H. L. Choi, Walter W. C. Chung, T. C. Edwin Cheng, P. P. K. Chiu
    A Predictive and Reactive Scheduling Tool Kit for Repetitive Manufacturing. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:147-162 [Conf]
  12. Roger M. Kerr, Elizabeth Szelke
    Open Discussion - A Summary. [Citation Graph (0, 0)][DBLP]
    Knowledge-Based Reactive Scheduling, 1993, pp:163-164 [Conf]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002