|
Conferences in DBLP
- Klaus Fischer
Knowledge-based Reactive Scheduling in a Flexible Manufacturing System. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:1-18 [Conf]
- Brian J. Garner, G. J. Ridley
Application of Neural Network Process Models in Reactive Scheduling. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:19-28 [Conf]
- Paddy Jordan, Jim Browne, Mary Browne
Production Activity Control for Small Manufacturing Enterprises. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:29-38 [Conf]
- Jürgen Dorn, Roger Kerr, Gabi Thalhammer
Reactive Scheduling in a Fuzzy-Temporal Framework. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:39-56 [Conf]
- Günter Schmidt
How to Apply fuzzy Logic to Reactive Production Scheduling. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:57-68 [Conf]
- Hubert Mulkens
Revisiting the Johnson Algorithm for Flow-Shop Scheduling with Genetic Algorithms. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:69-80 [Conf]
- Prasad Raja, Luis Ruiz, J. Hernandez, Guevara Noubir, Marc Riese
Scheduling for Absolute Temporal Consistency. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:81-92 [Conf]
- Stephen F. Smith, Ora Lassila
Configurable Systems for Reactive Production Management. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:93-106 [Conf]
- Katia P. Sycara, Kazuo Miyashita
Adaptive Schedule Repair. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:107-124 [Conf]
- Elizabeth Szelke, G. Márkus
Reactive Scheduling - An Intelligent Supervisor Function. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:125-146 [Conf]
- Migar M. C. Tam, Doris H. L. Choi, Walter W. C. Chung, T. C. Edwin Cheng, P. P. K. Chiu
A Predictive and Reactive Scheduling Tool Kit for Repetitive Manufacturing. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:147-162 [Conf]
- Roger M. Kerr, Elizabeth Szelke
Open Discussion - A Summary. [Citation Graph (0, 0)][DBLP] Knowledge-Based Reactive Scheduling, 1993, pp:163-164 [Conf]
|