The SCEAS System
Navigation Menu

Journals in DBLP

J. Scheduling
2004, volume: 7, number: 5

  1. Wenci Yu, Han Hoogeveen, Jan Karel Lenstra
    Minimizing Makespan in a Two-Machine Flow Shop with Delays and Unit-Time Operations is NP-Hard. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2004, v:7, n:5, pp:333-348 [Journal]
  2. Peter Damaschke
    Scheduling Search Procedures. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2004, v:7, n:5, pp:349-364 [Journal]
  3. Ari Freund, Joseph Naor
    Approximating the Advertisement Placement Problem. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2004, v:7, n:5, pp:365-374 [Journal]
  4. H. Neil Geismar, Milind Dawande, Chelliah Sriskandarajah
    Robotic Cells with Parallel Machines: Throughput Maximization in Constant Travel-Time Cells. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2004, v:7, n:5, pp:375-395 [Journal]
  5. Dirk C. Mattfeld
    Conference Diary. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2004, v:7, n:5, pp:397-399 [Journal]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002