The SCEAS System
Navigation Menu

Journals in DBLP

European Journal of Operational Research
2005, volume: 165, number: 2

  1. Vicente Valls, Jan Weglarz
    Project management and scheduling. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:285-288 [Journal]
  2. Willy Herroelen, Roel Leus
    Project scheduling under uncertainty: Survey and research potentials. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:289-306 [Journal]
  3. Salah E. Elmaghraby
    On the fallacy of averages in project risk management. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:307-313 [Journal]
  4. Christian Artigues, Jean-Charles Billaut, Carl Esswein
    Maximization of solution flexibility for robust shop scheduling. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:314-328 [Journal]
  5. Anand Paul, Genaro Gutierrez
    Simple probability models for project contracting. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:329-338 [Journal]
  6. Can Akkan, Andreas Drexl, Alf Kimms
    Network decomposition-based benchmark results for the discrete time-cost tradeoff problem. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:339-358 [Journal]
  7. Mario Vanhoucke
    New computational results for the discrete time/cost trade-off problem with time-switch constraints. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:359-374 [Journal]
  8. Vicente Valls, Francisco Ballestín, Sacramento Quintanilla
    Justification and RCPSP: A technique that pays. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:375-386 [Journal]
  9. Sergey V. Sevastianov
    An introduction to multi-parameter complexity analysis of discrete problems. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:387-397 [Journal]
  10. Peter Brucker, Sigrid Knust, Guoqing Wang
    Complexity results for flow-shop problems with a single server. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:398-407 [Journal]
  11. Jacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner
    The two-machine flow-shop problem with weighted late work criterion and common due date. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:408-415 [Journal]
  12. Adam Janiak, Mikhail Y. Kovalyov, Wieslaw Kubiak, Frank Werner
    Positive half-products and scheduling with controllable processing times. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:416-422 [Journal]
  13. T. C. Edwin Cheng, C. T. Ng, J. J. Yuan, Z. H. Liu
    Single machine scheduling to minimize total weighted tardiness. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:423-443 [Journal]
  14. T. C. Edwin Cheng, Natalia V. Shakhlevich
    Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:444-456 [Journal]
  15. Marco Ghirardi, Chris N. Potts
    Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:457-467 [Journal]
  16. Gaurav Singh
    Scheduling UET-UCT outforests to minimize maximum lateness. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:468-478 [Journal]
  17. Rubén Ruiz, Concepción Maroto
    A comprehensive review and evaluation of permutation flowshop heuristics. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:479-494 [Journal]
  18. Klaus Neumann, Christoph Schwindt, Norbert Trautmann
    Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:495-509 [Journal]
  19. Francis Sourd, Jerome Rogerie
    Continuous filling and emptying of storage systems in constraint-based scheduling. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:510-524 [Journal]
  20. Ramón Alvarez-Valdés, A. Fuertes, José Manuel Tamarit, G. Giménez, R. Ramos
    A heuristic to schedule flexible job-shop in a glass factory. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:525-534 [Journal]
  21. Philippe Lacomme, Christian Prins, Wahiba Ramdane-Chérif
    Evolutionary algorithms for periodic arc routing problems. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:535-553 [Journal]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002