The SCEAS System
Navigation Menu

Journals in DBLP

Computers & OR
2009, volume: 36, number: 2


  1. Guest Editorial. [Citation Graph (, )][DBLP]


  2. Scheduling of coupled tasks and one-machine no-wait robotic cells. [Citation Graph (, )][DBLP]


  3. A hybrid algorithm for the single-machine total tardiness problem. [Citation Graph (, )][DBLP]


  4. L-class enumeration algorithms for a discrete production planning problem with interval resource quantities. [Citation Graph (, )][DBLP]


  5. A note: Common due date assignment for a single machine scheduling with the rate-modifying activity. [Citation Graph (, )][DBLP]


  6. Pure cycles in flexible robotic cells. [Citation Graph (, )][DBLP]


  7. Minimizing makespan for multi-spindle head machines with a mobile table. [Citation Graph (, )][DBLP]


  8. A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. [Citation Graph (, )][DBLP]


  9. Approximation results for flow shop scheduling problems with machine availability constraints. [Citation Graph (, )][DBLP]


  10. Flowshop scheduling problem with a batching machine and task compatibilities. [Citation Graph (, )][DBLP]


  11. A memetic algorithm for the flexible flow line scheduling problem with processor blocking. [Citation Graph (, )][DBLP]


  12. Queueing network analysis on dynamic lot streaming. [Citation Graph (, )][DBLP]


  13. A new heuristic algorithm for cuboids packing with no orientation constraints. [Citation Graph (, )][DBLP]


  14. Ant algorithms and simulated annealing for multicriteria dynamic programming. [Citation Graph (, )][DBLP]


  15. A heuristic based on multi-exchange techniques for a regional fleet assignment location-routing problem. [Citation Graph (, )][DBLP]


  16. Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system. [Citation Graph (, )][DBLP]


  17. Two machine flow shop scheduling problem with weighted WIP costs. [Citation Graph (, )][DBLP]


  18. Hybridizing the cross-entropy method: An application to the max-cut problem. [Citation Graph (, )][DBLP]


  19. Optimizing profits from hydroelectricity production. [Citation Graph (, )][DBLP]


  20. A cross entropy-Lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times. [Citation Graph (, )][DBLP]


  21. Multiobjective target setting in data envelopment analysis using AHP. [Citation Graph (, )][DBLP]


  22. Scheduling jobs on a single machine to maximize the total revenue of jobs. [Citation Graph (, )][DBLP]


  23. Extended dominance and a stochastic shortest path problem. [Citation Graph (, )][DBLP]


  24. The capacity and distance constrained plant location problem. [Citation Graph (, )][DBLP]


  25. Heuristic algorithm for a cutting stock problem in the steel bridge construction. [Citation Graph (, )][DBLP]


  26. Using interactive multiobjective methods to solve DEA problems with value judgements. [Citation Graph (, )][DBLP]

NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002