The SCEAS System
Navigation Menu

Journals in DBLP

Computers & OR
2009, volume: 36, number: 8


  1. Special issue on constraint programming. [Citation Graph (, )][DBLP]


  2. Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound. [Citation Graph (, )][DBLP]


  3. Approximated consistency for the automatic recording constraint. [Citation Graph (, )][DBLP]


  4. Scheduling with uncertain durations: Modeling beta-robust scheduling with constraints. [Citation Graph (, )][DBLP]


  5. Parallel and distributed local search in COMET. [Citation Graph (, )][DBLP]


  6. A generative power-law search tree model. [Citation Graph (, )][DBLP]


  7. Preemptive scheduling in the presence of transportation times. [Citation Graph (, )][DBLP]


  8. Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration. [Citation Graph (, )][DBLP]


  9. On stochastic dynamic programming for solving large-scale planning problems under uncertainty. [Citation Graph (, )][DBLP]


  10. A heuristic approach for the max-min diversity problem based on max-clique. [Citation Graph (, )][DBLP]


  11. Enhancements of two-stage stochastic decomposition. [Citation Graph (, )][DBLP]


  12. A route set construction algorithm for the transit network design problem. [Citation Graph (, )][DBLP]


  13. A novel hybrid algorithm for scheduling steel-making continuous casting production. [Citation Graph (, )][DBLP]


  14. Quantifying suppliers' product quality and delivery performance: A sourcing policy decision model. [Citation Graph (, )][DBLP]


  15. Dantzig-Wolfe and block coordinate-descent decomposition in large-scale integrated refinery-planning. [Citation Graph (, )][DBLP]


  16. Developing a coordinated vendor-buyer model in two-stage supply chains with stochastic lead-times. [Citation Graph (, )][DBLP]


  17. SimMan - A simulation model for workforce capacity planning. [Citation Graph (, )][DBLP]


  18. A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems. [Citation Graph (, )][DBLP]

NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002