The SCEAS System
Navigation Menu

Journals in DBLP

Computers & OR
2004, volume: 31, number: 12

  1. Sin C. Ho, Dag Haugland
    A tabu search heuristic for the vehicle routing problem with time windows and split deliveries. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:1947-1964 [Journal]
  2. Tsan-Ming Choi, Duan Li, Houmin Yan
    Optimal single ordering policy with multiple delivery modes and Bayesian information updates. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:1965-1984 [Journal]
  3. Christian Prins
    A simple and effective evolutionary algorithm for the vehicle routing problem. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:1985-2002 [Journal]
  4. Huan-Neng Chiu, Jen-Huei Chang, Chia-Hsin Lee
    Lot streaming models with a limited number of capacitated transporters in multistage batch production systems. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2003-2020 [Journal]
  5. Chih-Hsiung Wang
    The impact of a free-repair warranty policy on EMQ model for imperfect production systems. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2021-2035 [Journal]
  6. Jean Berger, Mohamed Barkaoui
    A parallel hybrid genetic algorithm for the vehicle routing problem with time windows. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2037-2053 [Journal]
  7. Hark-Chin Hwang, Soo Y. Chang, Kangbok Lee
    Parallel machine scheduling under a grade of service provision. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2055-2061 [Journal]
  8. Masao Yokoyama
    Scheduling for two-stage production system with setup and assembly operations. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2063-2078 [Journal]
  9. Hung-Chi Chang
    An application of fuzzy sets theory to the EOQ model with imperfect quality items. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2079-2092 [Journal]
  10. Huang Wenqi, Yin Aihua
    An improved shifting bottleneck procedure for the job shop scheduling problem. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2093-2110 [Journal]
  11. Parthasarati Dileepan
    A note on minimizing maximum lateness in a two-machine no-wait flowshop. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2004, v:31, n:12, pp:2111-2115 [Journal]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002