The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

Hairong Zhao: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. Artur Czumaj, Hairong Zhao
    Fault-tolerant geometric spanners. [Citation Graph (0, 0)][DBLP]
    Symposium on Computational Geometry, 2003, pp:1-10 [Conf]
  2. André Berger, Artur Czumaj, Michelangelo Grigni, Hairong Zhao
    Approximation Schemes for Minimum 2-Connected Spanning Subgraphs in Weighted Planar Graphs. [Citation Graph (0, 0)][DBLP]
    ESA, 2005, pp:472-483 [Conf]
  3. Artur Czumaj, Andrzej Lingas, Hairong Zhao
    Polynomial-Time Approximation Schemes for the Euclidean Survivable Network Design Problem. [Citation Graph (0, 0)][DBLP]
    ICALP, 2002, pp:973-984 [Conf]
  4. Joseph Y.-T. Leung, Hairong Zhao
    Minimizing Mean Flowtime on Master-Slave Machines. [Citation Graph (0, 0)][DBLP]
    PDPTA, 2004, pp:939-945 [Conf]
  5. Artur Czumaj, Michelangelo Grigni, Papa Sissokho, Hairong Zhao
    Approximation schemes for minimum 2-edge-connected and biconnected subgraphs in planar graphs. [Citation Graph (0, 0)][DBLP]
    SODA, 2004, pp:496-505 [Conf]
  6. Artur Czumaj, Hairong Zhao
    Fault-Tolerant Geometric Spanners. [Citation Graph (0, 0)][DBLP]
    Discrete & Computational Geometry, 2004, v:32, n:2, pp:207-230 [Journal]
  7. Joseph Y.-T. Leung, Hairong Zhao
    Minimizing mean flowtime and makespan on master-slave systems. [Citation Graph (0, 0)][DBLP]
    J. Parallel Distrib. Comput., 2005, v:65, n:7, pp:843-856 [Journal]
  8. Yumei Huo, Joseph Y.-T. Leung, Hairong Zhao
    Complexity of two dual criteria scheduling problems. [Citation Graph (0, 0)][DBLP]
    Oper. Res. Lett., 2007, v:35, n:2, pp:211-220 [Journal]
  9. Joseph Y.-T. Leung, Hairong Zhao
    Minimizing Sum of Completion Times and Makespan in Master-Slave Systems. [Citation Graph (0, 0)][DBLP]
    IEEE Trans. Computers, 2006, v:55, n:8, pp:985-999 [Journal]
  10. Yumei Huo, Joseph Y.-T. Leung, Hairong Zhao
    Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardiness. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2007, v:177, n:1, pp:116-134 [Journal]

  11. Coordinated Scheduling of Production and Delivery with Production Window and Delivery Capacity Constraints. [Citation Graph (, )][DBLP]


  12. Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays. [Citation Graph (, )][DBLP]


  13. Makespan Minimization with Machine Availability Constraints. [Citation Graph (, )][DBLP]


  14. Approximation Schemes for Scheduling with Availability Constraints. [Citation Graph (, )][DBLP]


  15. Minimizing total completion time in two-machine flow shops with exact delays. [Citation Graph (, )][DBLP]


Search in 0.003secs, Finished in 0.004secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002