The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

J. Christopher Beck: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. J. Christopher Beck, Andrew J. Davenport, Edward M. Sitarski, Mark S. Fox
    Beyond Contention: Extending Texture-Based Scheduling Heuristics. [Citation Graph (0, 0)][DBLP]
    AAAI/IAAI, 1997, pp:233-240 [Conf]
  2. J. Christopher Beck, Andrew J. Davenport, Edward M. Sitarski, Mark S. Fox
    Texture-Based Heuristics for Scheduling Revisited. [Citation Graph (0, 0)][DBLP]
    AAAI/IAAI, 1997, pp:241-248 [Conf]
  3. J. Christopher Beck, Mark S. Fox
    Scheduling Alternative Activities. [Citation Graph (0, 0)][DBLP]
    AAAI/IAAI, 1999, pp:680-687 [Conf]
  4. Tom Carchrae, J. Christopher Beck
    Low-Knowledge Algorithm Control. [Citation Graph (0, 0)][DBLP]
    AAAI, 2004, pp:49-54 [Conf]
  5. J. Christopher Beck
    Heuristics for Constraint-Directed Scheduling with Inventory. [Citation Graph (0, 0)][DBLP]
    AIPS, 2000, pp:22-31 [Conf]
  6. J. Christopher Beck, Patrick Prosser, Evgeny Selensky
    Vehicle Routing and Job Shop Scheduling: What's the Difference? [Citation Graph (0, 0)][DBLP]
    ICAPS, 2003, pp:267-276 [Conf]
  7. J. Beck
    Multi-point Constructive Search. [Citation Graph (0, 0)][DBLP]
    CP, 2005, pp:737-741 [Conf]
  8. J. Christopher Beck, Tom Carchrae, Eugene C. Freuder, Georg Ringwelski
    Backtrack-Free Search for Real-Time Constraint Satisfaction. [Citation Graph (0, 0)][DBLP]
    CP, 2004, pp:92-106 [Conf]
  9. J. Christopher Beck, Andrew J. Davenport, Mark S. Fox
    Five Pitfalls of Empirical Scheduling Research. [Citation Graph (0, 0)][DBLP]
    CP, 1997, pp:390-404 [Conf]
  10. J. Christopher Beck, Patrick Prosser, Richard J. Wallace
    Variable Ordering Heuristics Show Promise. [Citation Graph (0, 0)][DBLP]
    CP, 2004, pp:711-715 [Conf]
  11. Tom Carchrae, J. Christopher Beck, Eugene C. Freuder
    Methods to Learn Abstract Scheduling Models. [Citation Graph (0, 0)][DBLP]
    CP, 2005, pp:842- [Conf]
  12. Alfio Vidotto, Kenneth N. Brown, J. Beck
    Robust Constraint Solving Using Multiple Heuristics. [Citation Graph (0, 0)][DBLP]
    CP, 2005, pp:871- [Conf]
  13. Christine Wu, Kenneth N. Brown, J. Beck
    Scheduling with Uncertain Start Dates. [Citation Graph (0, 0)][DBLP]
    CP, 2005, pp:872- [Conf]
  14. J. Christopher Beck, Eugene C. Freuder
    Simple Rules for Low-Knowledge Algorithm Selection. [Citation Graph (0, 0)][DBLP]
    CPAIOR, 2004, pp:50-64 [Conf]
  15. J. Christopher Beck, Patrick Prosser, Richard J. Wallace
    Trying Again to Fail-First. [Citation Graph (0, 0)][DBLP]
    CSCLP, 2004, pp:41-55 [Conf]
  16. J. Christopher Beck, Patrick Prosser, Richard J. Wallace
    Failing First: An Update. [Citation Graph (0, 0)][DBLP]
    ECAI, 2004, pp:959-960 [Conf]
  17. J. Christopher Beck, Nic Wilson
    Job Shop Scheduling with Probabilistic Durations. [Citation Graph (0, 0)][DBLP]
    ECAI, 2004, pp:652-656 [Conf]
  18. J. Christopher Beck, Patrick Prosser, Evgeny Selensky
    Graph Transformations for the Vehicle Routing and Job Shop Scheduling Problems. [Citation Graph (0, 0)][DBLP]
    ICGT, 2002, pp:60-74 [Conf]
  19. J. Christopher Beck, Nic Wilson
    Proactive Algorithms for Scheduling with Probabilistic Durations. [Citation Graph (0, 0)][DBLP]
    IJCAI, 2005, pp:1201-1206 [Conf]
  20. Julien Bidot, Thierry Vidal, Philippe Laborie, J. Christopher Beck
    A General Framework for Scheduling in a Stochastic Environment. [Citation Graph (0, 0)][DBLP]
    IJCAI, 2007, pp:56-61 [Conf]
  21. J. Christopher Beck, Patrick Prosser, Evgeny Selensky
    On the Reformulation of Vehicle Routing Problems and Scheduling Problems. [Citation Graph (0, 0)][DBLP]
    SARA, 2002, pp:282-289 [Conf]
  22. Tom Carchrae, J. Christopher Beck
    Learning Abstract Scheduling Models. [Citation Graph (0, 0)][DBLP]
    SARA, 2005, pp:354-355 [Conf]
  23. J. Christopher Beck, Mark S. Fox
    Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics. [Citation Graph (0, 0)][DBLP]
    Artif. Intell., 2000, v:117, n:1, pp:31-81 [Journal]
  24. J. Christopher Beck, Mark S. Fox
    Constraint-directed techniques for scheduling alternative activities. [Citation Graph (0, 0)][DBLP]
    Artif. Intell., 2000, v:121, n:1-2, pp:211-250 [Journal]
  25. Jean-Paul Watson, J. Christopher Beck, Adele E. Howe, L. Darrell Whitley
    Problem difficulty for tabu search in job-shop scheduling. [Citation Graph (0, 0)][DBLP]
    Artif. Intell., 2003, v:143, n:2, pp:189-217 [Journal]
  26. J. Christopher Beck, Mark S. Fox
    A Generic Framework for Constraint-Directed Search and Scheduling. [Citation Graph (0, 0)][DBLP]
    AI Magazine, 1998, v:19, n:4, pp:101-130 [Journal]
  27. J. Christopher Beck, Andrew J. Davenport, Claude Le Pape
    Introduction. [Citation Graph (0, 0)][DBLP]
    Constraints, 2000, v:5, n:4, pp:327-334 [Journal]
  28. Alfio Vidotto, Kenneth N. Brown, J. Christopher Beck
    Managing restaurant tables using constraints. [Citation Graph (0, 0)][DBLP]
    Knowl.-Based Syst., 2007, v:20, n:2, pp:160-169 [Journal]
  29. Daria Terekhov, J. Christopher Beck, Kenneth N. Brown
    Solving a Stochastic Queueing Design and Control Problem with Constraint Programming. [Citation Graph (0, 0)][DBLP]
    AAAI, 2007, pp:261-266 [Conf]
  30. J. Christopher Beck
    An Empirical Study of Multi-Point Constructive Search for Constraint-Based Scheduling. [Citation Graph (0, 0)][DBLP]
    ICAPS, 2006, pp:274-283 [Conf]
  31. Daria Terekhov, J. Christopher Beck
    Solving a Stochastic Queueing Control Problem with Constraint Programming. [Citation Graph (0, 0)][DBLP]
    CPAIOR, 2007, pp:303-317 [Conf]
  32. András Kovács, J. Christopher Beck
    A Global Constraint for Total Weighted Completion Time. [Citation Graph (0, 0)][DBLP]
    CPAIOR, 2007, pp:112-126 [Conf]
  33. J. Christopher Beck, Michael Gruninger
    What's Your Problem? The Problem of Problem Definition. [Citation Graph (0, 0)][DBLP]
    SARA, 2007, pp:393-394 [Conf]
  34. J. Christopher Beck, Nic Wilson
    Proactive Algorithms for Job Shop Scheduling with Probabilistic Durations. [Citation Graph (0, 0)][DBLP]
    J. Artif. Intell. Res. (JAIR), 2007, v:28, n:, pp:183-232 [Journal]
  35. J. Christopher Beck
    Solution-Guided Multi-Point Constructive Search for Job Shop Scheduling. [Citation Graph (0, 0)][DBLP]
    J. Artif. Intell. Res. (JAIR), 2007, v:29, n:, pp:49-77 [Journal]

  36. Probabilistically Estimating Backbones and Variable Bias: Experimental Overview. [Citation Graph (, )][DBLP]


  37. Solving a Location-Allocation Problem with Logic-Based Benders' Decomposition. [Citation Graph (, )][DBLP]


  38. Fitness-Distance Correlation and Solution-Guided Multi-point Constructive Search for CSPs. [Citation Graph (, )][DBLP]


  39. A Hybrid Constraint Programming / Local Search Approach to the Job-Shop Scheduling Problem. [Citation Graph (, )][DBLP]


  40. Applying Machine Learning to Low-Knowledge Control of Optimization Algorithms. [Citation Graph (, )][DBLP]


  41. Scheduling with uncertain durations: Modeling beta-robust scheduling with constraints. [Citation Graph (, )][DBLP]


Search in 0.004secs, Finished in 0.007secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002