The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

Patrick Prosser: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. Patrick Prosser
    A Reactive Scheduling Agent. [Citation Graph (1, 0)][DBLP]
    IJCAI, 1989, pp:1004-1009 [Conf]
  2. Ian P. Gent, Holger H. Hoos, Patrick Prosser, Toby Walsh
    Morphing: Combining Structure and Randomness. [Citation Graph (0, 0)][DBLP]
    AAAI/IAAI, 1999, pp:654-660 [Conf]
  3. Ian P. Gent, Ewan MacIntyre, Patrick Prosser, Toby Walsh
    The Constrainedness of Search. [Citation Graph (0, 0)][DBLP]
    AAAI/IAAI, Vol. 1, 1996, pp:246-252 [Conf]
  4. Ian P. Gent, Ewan MacIntyre, Patrick Prosser, Toby Walsh
    The Scaling of Search Cost. [Citation Graph (0, 0)][DBLP]
    AAAI/IAAI, 1997, pp:315-320 [Conf]
  5. J. Christopher Beck, Patrick Prosser, Evgeny Selensky
    Vehicle Routing and Job Shop Scheduling: What's the Difference? [Citation Graph (0, 0)][DBLP]
    ICAPS, 2003, pp:267-276 [Conf]
  6. Patrick Prosser, Evgeny Selensky
    A Study of Encodings of Constraint Satisfaction Problems with 0/1 Variables. [Citation Graph (0, 0)][DBLP]
    International Workshop on Constraint Solving and Constraint Logic Programming, 2002, pp:121-131 [Conf]
  7. J. Christopher Beck, Patrick Prosser, Richard J. Wallace
    Variable Ordering Heuristics Show Promise. [Citation Graph (0, 0)][DBLP]
    CP, 2004, pp:711-715 [Conf]
  8. Ian P. Gent, Robert W. Irving, David Manlove, Patrick Prosser, Barbara M. Smith
    A Constraint Programming Approach to the Stable Marriage Problem. [Citation Graph (0, 0)][DBLP]
    CP, 2001, pp:225-239 [Conf]
  9. Ian P. Gent, Ewan MacIntyre, Patrick Prosser, Toby Walsh
    Scaling Effects in the CSP Phase Transition. [Citation Graph (0, 0)][DBLP]
    CP, 1995, pp:70-87 [Conf]
  10. Ian P. Gent, Ewan MacIntyre, Patrick Prosser, Toby Walsh
    The Constrainedness of Arc Consistency. [Citation Graph (0, 0)][DBLP]
    CP, 1997, pp:327-340 [Conf]
  11. Ian P. Gent, Patrick Prosser, Barbara M. Smith, Wu Wei
    Supertree Construction with Constraint Programming. [Citation Graph (0, 0)][DBLP]
    CP, 2003, pp:837-841 [Conf]
  12. Ewan MacIntyre, Patrick Prosser, Barbara M. Smith, Toby Walsh
    Random Constraint Satisfaction: Theory Meets Practice. [Citation Graph (0, 0)][DBLP]
    CP, 1998, pp:325-339 [Conf]
  13. Patrick Prosser
    Forward Checking with Backmarking. [Citation Graph (0, 0)][DBLP]
    Constraint Processing, Selected Papers, 1995, pp:185-204 [Conf]
  14. Patrick Prosser
    The Dynamics of Dynamic Variable Ordering Heuristics. [Citation Graph (0, 0)][DBLP]
    CP, 1998, pp:17-23 [Conf]
  15. Patrick Prosser, Kostas Stergiou, Toby Walsh
    Singleton Consistencies. [Citation Graph (0, 0)][DBLP]
    CP, 2000, pp:353-368 [Conf]
  16. Chris Unsworth, Patrick Prosser
    Specialised Constraints for Stable Matching Problems. [Citation Graph (0, 0)][DBLP]
    CP, 2005, pp:869- [Conf]
  17. Ian P. Gent, Ewan MacIntyre, Patrick Prosser, Barbara M. Smith, Toby Walsh
    An Empirical Study of Dynamic Variable Ordering Heuristics for the Constraint Satisfaction Problem. [Citation Graph (0, 0)][DBLP]
    CP, 1996, pp:179-193 [Conf]
  18. J. Christopher Beck, Patrick Prosser, Richard J. Wallace
    Trying Again to Fail-First. [Citation Graph (0, 0)][DBLP]
    CSCLP, 2004, pp:41-55 [Conf]
  19. J. Christopher Beck, Patrick Prosser, Richard J. Wallace
    Failing First: An Update. [Citation Graph (0, 0)][DBLP]
    ECAI, 2004, pp:959-960 [Conf]
  20. Ian P. Gent, Patrick Prosser
    An Empirical Study of the Stable Marriage Problem with Ties and Incomplete Lists. [Citation Graph (0, 0)][DBLP]
    ECAI, 2002, pp:141-145 [Conf]
  21. Patrick Prosser
    A Hybrid Genetic Algorithm for Pallet Loading. [Citation Graph (0, 0)][DBLP]
    ECAI, 1988, pp:159-164 [Conf]
  22. Patrick Prosser
    Binary Constraint Satisfaction Problems: Some are Harder than Others. [Citation Graph (0, 0)][DBLP]
    ECAI, 1994, pp:95-99 [Conf]
  23. Patrick Prosser, Chris Unsworth
    A Connectivity Constraint Using Bridges. [Citation Graph (0, 0)][DBLP]
    ECAI, 2006, pp:707-708 [Conf]
  24. J. Christopher Beck, Patrick Prosser, Evgeny Selensky
    Graph Transformations for the Vehicle Routing and Job Shop Scheduling Problems. [Citation Graph (0, 0)][DBLP]
    ICGT, 2002, pp:60-74 [Conf]
  25. Patrick Prosser
    Domain Filtering can Degrade Intelligent Backtracking Search. [Citation Graph (0, 0)][DBLP]
    IJCAI, 1993, pp:262-267 [Conf]
  26. J. Christopher Beck, Patrick Prosser, Evgeny Selensky
    On the Reformulation of Vehicle Routing Problems and Scheduling Problems. [Citation Graph (0, 0)][DBLP]
    SARA, 2002, pp:282-289 [Conf]
  27. Chris Unsworth, Patrick Prosser
    A Specialised Binary Constraint for the Stable Marriage Problem. [Citation Graph (0, 0)][DBLP]
    SARA, 2005, pp:218-233 [Conf]
  28. Peter Burke, Patrick Prosser
    A distributed asynchronous system for predictive and reactive scheduling. [Citation Graph (0, 0)][DBLP]
    AI in Engineering, 1991, v:6, n:3, pp:106-124 [Journal]
  29. Patrick Prosser
    An Empirical Study of Phase Transitions in Binary Constraint Satisfaction Problems. [Citation Graph (0, 0)][DBLP]
    Artif. Intell., 1996, v:81, n:1-2, pp:81-109 [Journal]
  30. Patrick Prosser
    Hybrid Algorithms for the Constraint Satisfaction Problem. [Citation Graph (0, 0)][DBLP]
    Computational Intelligence, 1993, v:9, n:, pp:268-299 [Journal]
  31. Philip Kilby, Patrick Prosser, Paul Shaw
    A Comparison of Traditional and Constraint-based Heuristic Methods on Vehicle Routing Problems with Side Constraints. [Citation Graph (0, 0)][DBLP]
    Constraints, 2000, v:5, n:4, pp:389-414 [Journal]
  32. Ian P. Gent, Ewan MacIntyre, Patrick Prosser, Barbara M. Smith, Toby Walsh
    Random Constraint Satisfaction: Flaws and Structure. [Citation Graph (0, 0)][DBLP]
    Constraints, 2001, v:6, n:4, pp:345-372 [Journal]
  33. Bruno De Backer, Vincent Furnon, Paul Shaw, Philip Kilby, Patrick Prosser
    Solving Vehicle Routing Problems Using Constraint Programming and Metaheuristics. [Citation Graph (0, 0)][DBLP]
    J. Heuristics, 2000, v:6, n:4, pp:501-523 [Journal]
  34. J. Beck, Patrick Prosser, Evgeny Selensky
    A case study of mutual routing-scheduling reformulation. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2006, v:9, n:5, pp:469-491 [Journal]
  35. David Manlove, Gregg O'Malley, Patrick Prosser, Chris Unsworth
    A Constraint Programming Approach to the Hospitals / Residents Problem. [Citation Graph (0, 0)][DBLP]
    CPAIOR, 2007, pp:155-170 [Conf]

  36. A Hardware Relaxation Paradigm for Solving NP-Hard Problems. [Citation Graph (, )][DBLP]


Search in 0.044secs, Finished in 0.045secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002