The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

Toly Chen: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. Toly Chen
    Applying an Intelligent Neural System to Predicting Lot Output Time in a Semiconductor Fabrication Factory. [Citation Graph (0, 0)][DBLP]
    ICONIP (3), 2006, pp:581-588 [Conf]
  2. Toly Chen
    A Look-Ahead Fuzzy Back Propagation Network for Lot Output Time Series Prediction in a Wafer Fab. [Citation Graph (0, 0)][DBLP]
    ICONIP (3), 2006, pp:974-982 [Conf]
  3. Toly Chen
    A Fuzzy Set Approach for Evaluating the Achievability of an Output Time Forecast in a Wafer Fabrication Plant. [Citation Graph (0, 0)][DBLP]
    MICAI, 2006, pp:483-493 [Conf]
  4. Toly Chen, Yu-Cheng Lin
    A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory. [Citation Graph (0, 0)][DBLP]
    RSCTC, 2006, pp:757-766 [Conf]
  5. Toly Chen
    A fuzzy back propagation network for output time prediction in a wafer fab. [Citation Graph (0, 0)][DBLP]
    Appl. Soft Comput., 2003, v:2, n:3, pp:211-222 [Journal]
  6. Toly Chen
    A new cache document replacement policy considering the contribution to sales. [Citation Graph (0, 0)][DBLP]
    Electronic Commerce Research and Applications, 2005, v:4, n:3, pp:283-297 [Journal]
  7. David Huang, Toly Chen, Mao-Jiun J. Wang
    A fuzzy set approach for event tree analysis. [Citation Graph (0, 0)][DBLP]
    Fuzzy Sets and Systems, 2001, v:118, n:1, pp:153-165 [Journal]
  8. Toly Chen
    A Hybrid SOM-BPN Approach to Lot Output Time Prediction in a Wafer Fab. [Citation Graph (0, 0)][DBLP]
    Neural Processing Letters, 2006, v:24, n:3, pp:271-288 [Journal]
  9. Toly Chen
    Obtaining the optimal cache document replacement policy for the caching system of an EC website. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2007, v:181, n:2, pp:828-841 [Journal]
  10. Toly Chen
    An intelligent hybrid system for wafer lot output time prediction. [Citation Graph (0, 0)][DBLP]
    Advanced Engineering Informatics, 2007, v:21, n:1, pp:55-65 [Journal]
  11. Toly Chen
    Incorporating fuzzy c-means and a back-propagation network ensemble to job completion time prediction in a semiconductor fabrication factory. [Citation Graph (0, 0)][DBLP]
    Fuzzy Sets and Systems, 2007, v:158, n:19, pp:2153-2168 [Journal]

  12. Online Collaborative Stock Control and Selling Among E-Retailers. [Citation Graph (, )][DBLP]


  13. Evaluating and Enhancing the Long-Term Competitiveness of a Semiconductor Product. [Citation Graph (, )][DBLP]


  14. Self-adaptive Agent-Based Dynamic Scheduling for a Semiconductor Manufacturing Factory. [Citation Graph (, )][DBLP]


  15. A fuzzy back propagation network ensemble with example classification for lot output time prediction in a wafer fab. [Citation Graph (, )][DBLP]


  16. Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab. [Citation Graph (, )][DBLP]


Search in 0.103secs, Finished in 0.105secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002