Ali Allahverdi Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times. [Citation Graph (0, 0)][DBLP] Computers & OR, 2000, v:27, n:2, pp:111-127 [Journal]
Ali Allahverdi A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness. [Citation Graph (0, 0)][DBLP] Computers & OR, 2004, v:31, n:2, pp:157-180 [Journal]
Ali Allahverdi Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. [Citation Graph (0, 0)][DBLP] Computers & OR, 1996, v:23, n:10, pp:909-916 [Journal]
Ali Allahverdi Scheduling in stochastic flowshops with independent setup, processing and removal times. [Citation Graph (0, 0)][DBLP] Computers & OR, 1997, v:24, n:10, pp:955-960 [Journal]
Ali Allahverdi, Fawaz S. Al-Anzi Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications. [Citation Graph (0, 0)][DBLP] Computers & OR, 2002, v:29, n:8, pp:971-994 [Journal]
Ali Allahverdi, Fawaz S. Al-Anzi A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. [Citation Graph (0, 0)][DBLP] Computers & OR, 2006, v:33, n:, pp:1056-1080 [Journal]
Fawaz S. Al-Anzi, Ali Allahverdi A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. [Citation Graph (0, 0)][DBLP] European Journal of Operational Research, 2007, v:182, n:1, pp:80-94 [Journal]
Ali Allahverdi, Fawaz S. Al-Anzi A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. [Citation Graph (0, 0)][DBLP] European Journal of Operational Research, 2006, v:169, n:3, pp:767-780 [Journal]
Ali Allahverdi The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. [Citation Graph (0, 0)][DBLP] European Journal of Operational Research, 2003, v:147, n:2, pp:373-396 [Journal]
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness. [Citation Graph (, )][DBLP]
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. [Citation Graph (, )][DBLP]
The two-stage assembly scheduling problem to minimize total completion time with setup times. [Citation Graph (, )][DBLP]
Search in 0.002secs, Finished in 0.002secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP