The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

Sigrid Knust: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. Peter Brucker, Sigrid Knust
    Resource-Constrained Project Scheduling and Timetabling. [Citation Graph (0, 0)][DBLP]
    PATAT, 2000, pp:277-293 [Conf]
  2. Philippe Baptiste, Peter Brucker, Sigrid Knust, Vadim G. Timkovsky
    Ten notes on equal-processing-time scheduling. [Citation Graph (0, 0)][DBLP]
    4OR, 2004, v:2, n:2, pp:111-127 [Journal]
  3. Peter Brucker, Sigrid Knust
    Complexity Results for Single-Machine Problems with Positive Finish-Start Time-Lags. [Citation Graph (0, 0)][DBLP]
    Computing, 1999, v:63, n:4, pp:299-316 [Journal]
  4. Johann Hurink, Sigrid Knust
    Makespan minimization for flow-shop problems with transportation times and a single robot. [Citation Graph (0, 0)][DBLP]
    Discrete Applied Mathematics, 2001, v:112, n:1-3, pp:199-216 [Journal]
  5. Johann Hurink, Sigrid Knust
    A tabu search algorithm for scheduling a single robot in a job-shop environment. [Citation Graph (0, 0)][DBLP]
    Discrete Applied Mathematics, 2002, v:119, n:1-2, pp:181-203 [Journal]
  6. Johann Hurink, Sigrid Knust
    List scheduling in a parallel machine environment with precedence constraints and setup times. [Citation Graph (0, 0)][DBLP]
    Oper. Res. Lett., 2001, v:29, n:5, pp:231-239 [Journal]
  7. Johann Hurink, Sigrid Knust
    Tabu search algorithms for job-shop problems with a single transport robot. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:162, n:1, pp:99-111 [Journal]
  8. Peter Brucker, Sigrid Knust, Guoqing Wang
    Complexity results for flow-shop problems with a single server. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:165, n:2, pp:398-407 [Journal]
  9. Peter Brucker, Sigrid Knust
    Lower bounds for resource-constrained project scheduling problems. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2003, v:149, n:2, pp:302-313 [Journal]
  10. Peter Brucker, Sigrid Knust
    Sequencing and scheduling. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2003, v:149, n:2, pp:247-248 [Journal]

  11. Minimizing costs in round robin tournaments with place constraints. [Citation Graph (, )][DBLP]


  12. Scheduling in sports: An annotated bibliography. [Citation Graph (, )][DBLP]


  13. Constructing fair sports league schedules with regard to strength groups. [Citation Graph (, )][DBLP]


Search in 0.001secs, Finished in 0.002secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002