The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

Alex J. Ruiz-Torres: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. Dayana Cope, Mansooreh Mollaghasemi, Assem Kaylani, Alex J. Ruiz-Torres, Martin J. Steele, Marcella L. Cowen
    An Integrated Estimation and Modeling Environment for the Design of the Orbital Space Plane. [Citation Graph (0, 0)][DBLP]
    Winter Simulation Conference, 2004, pp:459-465 [Conf]
  2. Alex J. Ruiz-Torres, Kazuo Nakatani
    Application of Real-Time Simulation to Assign Due Dates on Logistic-manufacturing Networks. [Citation Graph (0, 0)][DBLP]
    Winter Simulation Conference, 1998, pp:1205-1210 [Conf]
  3. Alex J. Ruiz-Torres, John E. Tyworth
    Simulation Based Approach to Study the Interaction of Scheduling and Routing on a Logistic Network. [Citation Graph (0, 0)][DBLP]
    Winter Simulation Conference, 1997, pp:1189-1194 [Conf]
  4. Alex J. Ruiz-Torres, Edgar Zapata
    Simulation based operational analysis of future space transportation systems. [Citation Graph (0, 0)][DBLP]
    Winter Simulation Conference, 2000, pp:1123-1131 [Conf]
  5. Alex J. Ruiz-Torres, Grisselle Centeno
    Scheduling with flexible resources in parallel workcenters to minimize maximum completion time. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2007, v:34, n:1, pp:48-69 [Journal]
  6. Alex J. Ruiz-Torres, Edgar Zapata, Kazuo Nakatani, Marcella L. Cowen
    Knowledge based representation and operations assessment of space transportation system architectures. [Citation Graph (0, 0)][DBLP]
    Knowl.-Based Syst., 2006, v:19, n:7, pp:516-523 [Journal]
  7. Alex J. Ruiz-Torres, Francisco J. López, Johnny C. Ho
    Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2007, v:179, n:2, pp:302-315 [Journal]
  8. J. N. D. Gupta, Alex J. Ruiz-Torres
    Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:167, n:3, pp:679-695 [Journal]

  9. Minimizing the number of late jobs for the permutation flowshop problem with secondary resources. [Citation Graph (, )][DBLP]


  10. Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility. [Citation Graph (, )][DBLP]


Search in 0.021secs, Finished in 0.022secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002