|
Search the dblp DataBase
Juergen Potoradi:
[Publications]
[Author Rank by year]
[Co-authors]
[Prefers]
[Cites]
[Cited by]
Publications of Author
- Charles D. McAllister, Bertan Altuntas, Matthew Frank, Juergen Potoradi
Implementation of response surface methodology using variance reduction techniques in semiconductor manufacturing. [Citation Graph (0, 0)][DBLP] Winter Simulation Conference, 2001, pp:1225-1230 [Conf]
- Juergen Potoradi, Ong Siong Boon, Scott J. Mason, John W. Fowler, Michele E. Pfund
Semiconductor manufacturing: using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility. [Citation Graph (0, 0)][DBLP] Winter Simulation Conference, 2002, pp:1857-1861 [Conf]
- Juergen Potoradi, Gerald Winz, Lee Weng Kam
Determining optimal lot-size for a semiconductor back-end factory. [Citation Graph (0, 0)][DBLP] Winter Simulation Conference, 1999, pp:720-726 [Conf]
Search in 0.001secs, Finished in 0.001secs
|