The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

M. Selim Akturk: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. M. Selim Akturk, Siraceddin Onen
    Dynamic lot sizing and tool management in automated manufacturing systems. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2002, v:29, n:8, pp:1059-1079 [Journal]
  2. M. Selim Akturk, M. Bayram Yildirim
    A new lower bounding scheme for the total weighted tardiness problem. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 1998, v:25, n:4, pp:265-278 [Journal]
  3. Selcuk Avci, M. Selim Akturk
    Tool magazine arrangement and operations sequencing on CNC machines. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 1996, v:23, n:11, pp:1069-1081 [Journal]
  4. M. Selim Akturk, Hakan Gultekin, Oya Ekin Karasan
    Robotic cell scheduling with operational flexibility. [Citation Graph (0, 0)][DBLP]
    Discrete Applied Mathematics, 2005, v:145, n:3, pp:334-348 [Journal]
  5. Hakan Gultekin, M. Selim Akturk, Oya Ekin Karasan
    Cyclic scheduling of a 2-machine robotic cell with tooling constraints. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2006, v:174, n:2, pp:777-796 [Journal]
  6. Sinan Gurel, M. Selim Akturk
    Considering manufacturing cost and scheduling performance on a CNC turning machine. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2007, v:177, n:1, pp:325-343 [Journal]
  7. Rabia K. Kayan, M. Selim Akturk
    A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2005, v:167, n:3, pp:624-643 [Journal]
  8. M. Selim Akturk, Jay B. Ghosh, Evrim D. Gunes
    Scheduling with tool changes to minimize total completion time: Basic results and SPT performance. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2004, v:157, n:3, pp:784-790 [Journal]

  9. Scheduling parallel CNC machines with time/cost trade-off considerations. [Citation Graph (, )][DBLP]


  10. Scheduling with tool changes to minimize total completion time under controllable machining conditions. [Citation Graph (, )][DBLP]


  11. Scheduling in a three-machine robotic flexible manufacturing cell. [Citation Graph (, )][DBLP]


  12. Pure cycles in flexible robotic cells. [Citation Graph (, )][DBLP]


  13. Bicriteria robotic operation allocation in a flexible manufacturing cell. [Citation Graph (, )][DBLP]


Search in 0.004secs, Finished in 0.005secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002