The SCEAS System
Navigation Menu

Conferences in DBLP

IFIP WG5.7 Publications (ifip5-7)
1996 (conf/ifip5-7/1996apms)

  1. Asbjørn Rolstadås
    Productivity issues in the future enterprise: conclusions and recommendations form the TOPP program. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:3-12 [Conf]
  2. J. Yoshikawa
    Establishing an academic domain. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:13-17 [Conf]
  3. Guy Doumeingts, Yves Ducq
    Production management: which future?. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:18-28 [Conf]
  4. T. Itoh
    Recent trends of new product development and production management in Japanese electronics industries. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:29-40 [Conf]
  5. T. Okabe, P. Bunce, R. Limoges
    Next generation manufacturing system (NGMS) in the IMS program. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:43-54 [Conf]
  6. J. Vaario, Kanji Ueda
    Biological concept of self-organization for dynamic shop-floor configuration. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:55-66 [Conf]
  7. Susumu Fujii, Hiroshi Morita, Y. Tatsuta, Y. Takata
    A basic study on high volume flexible manufacturing system for agile manufacturing. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:67-78 [Conf]
  8. Matt Williamson, Richard Lee Storch
    The collaborative engineering process within the framework of the virtual enterprise. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:79-90 [Conf]
  9. Frédérique Biennier, Joël Favrel, J. P. Denat
    Collaborative autonomous control. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:91-102 [Conf]
  10. Arian Zwegers, Henk Jan Pels, R. L. J. Schrijver, Roelof J. van den Berg
    An agent based control system for a model factory. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:103-114 [Conf]
  11. I. Dean, Allan S. Carrie
    Future enterprise types and strategies for agile manufacture. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:115-126 [Conf]
  12. Horst Wildemann
    Performance analysis through benchmarking and recognition of patterns. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:129-135 [Conf]
  13. V. Hornung, Holger Luczak, M. Oster
    Virtual benchmarking in logistics: a concept for the determination of benchmarks. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:136-147 [Conf]
  14. Ilias P. Tatsiopoulos, T. Katsikas, F. Clave
    A benchmarking model for the customer order flow in semi-processing industries. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:148-160 [Conf]
  15. Javier Borda Elejabarrieta
    MRP-3 concurrent integration of planning and scheduling in OKP (one of a kind production). [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:163-170 [Conf]
  16. M. J. Verweij, A. J. R. Zwegers
    Analysis and design of production and control structures. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:171-182 [Conf]
  17. Gert Zülch, B. Brinkmeier
    Designing organizational structures of production systems using a process-oriented approach. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:183-194 [Conf]
  18. A. Bartolotta, Marco Garetti
    Object-oriented representation of manufacturing systems: state of the art and perspectives. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:195-205 [Conf]
  19. E. Scherer
    Autonomy and integration in decentralized production. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:206-217 [Conf]
  20. H. de Haas, Jens O. Riis, Hans-Henrik Hvolby
    Centralized and decentralized control: finding the right combination. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:218-229 [Conf]
  21. Jens O. Riis, J. Knopp
    Implementing new production management modes: orchestration of simultaneous improvement activities. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:230-240 [Conf]
  22. S. Schwarze, Paul Schönsleben
    Recent developments in the configuration of multiple-variant products: application orientation ad vagueness in customer requirements. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:243-254 [Conf]
  23. H. Hübner
    The ecology-driven service(r)evolution: the product longevity approach and its consequences for production ad corporate management. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:255-266 [Conf]
  24. Jan Olhager, B. Cimander
    The impact of manufacturing strategy on the design of production management systems: an exploratory study. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:267-278 [Conf]
  25. A. K. Kochhar, Y. T. Abdul-Hamid
    Selection of assembly system configurations: a decision support system. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:279-290 [Conf]
  26. Hans-Henrik Hvolby, J. H. Trienekens
    Production control challenges in the food and iron industry. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:291-302 [Conf]
  27. M. Marimin, L. Herlina, A. Aulia, Motohide Umano, Itsuo Hatono, Hiroyuki Tamura
    Expert system for new product strategy development. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:303-314 [Conf]
  28. M. Kojima, K. Ohno, K. Nakashima
    Performance evaluation of a JIT production system. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:315-326 [Conf]
  29. Jens O. Riis, Riitta Smeds, John Johansen, Hans Mikkelsen
    Games for organizational learning in production management. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:327-338 [Conf]
  30. Mitsuhiro Enomoto, Hideaki Matoba, Hirotaka Morita, Tetsuji Segawa
    Production planning system coping with changing customer requirements. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:341-350 [Conf]
  31. Hans-Peter Wiendahl, J.-W. Breithaupt
    Production planning and control on the basis of control theory. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:351-352 [Conf]
  32. F. Oba, T. Murayama, D. Ma
    Integrated production management for production planning, loading and scheduling. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:363-374 [Conf]
  33. Milad F. Sebaaly, Hideo Fujimoto
    Integrated planning and scheduling for multi-product job-shop assembly based on genetic algorithms. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:375-386 [Conf]
  34. M. Shiota, S. Manabe
    Solution of the problem for a large scale integrated plan in the iron and sell production control. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:387-396 [Conf]
  35. H. Shin, M. Kuroda
    An autonomous jobshop scheduling system under dynamic production environment considering machine breakdowns. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:399-410 [Conf]
  36. Nobuhiro Sugimura, Toshimichi Moriwaki, K. Hozumi
    A study on holonic manufacturing systems and its applications to real time scheduling problems. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:411-422 [Conf]
  37. Itsuo Hatono, T. Nishiyama, Motohide Umano, Hiroyuki Tamura
    Performance evaluation of distributed real-time scheduling systems using distributed production system simulator. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:423-434 [Conf]
  38. H. Tamaki, T. Mukai, K. Kawakami, M. Araki
    Genetic algorithm approach to multi-objective scheduling problem in plastic forming plant. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:435-444 [Conf]
  39. H. Hase, Norio Okino
    A synthesized chart for scheduling of production systems with automated guided vehicle. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:445-454 [Conf]
  40. J. Cheng, H. Kise
    Scheduling for an automated three-machine flowshop manufacturing system. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:455-466 [Conf]
  41. J. Dorn, Mario Girsch, N. Vidakis
    DÉJÀ VU: a reusable framework for the construction of intelligent interactive schedulers. [Citation Graph (0, 0)][DBLP]
    APMS, 1996, pp:467-478 [Conf]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002