The SCEAS System
Navigation Menu

Search the dblp DataBase

Title:
Author:

Ceyda Oguz: [Publications] [Author Rank by year] [Co-authors] [Prefers] [Cites] [Cited by]

Publications of Author

  1. Muhammet Fikret Ercan, Ceyda Oguz, Yu-Fai Fung
    Job Scheduling in a Multi-layer Vision System. [Citation Graph (0, 0)][DBLP]
    Euro-Par, 1999, pp:317-321 [Conf]
  2. Muhammet Fikret Ercan, Ceyda Oguz, Yu-Fai Fung
    Performance Evaluation of Heuristics for Scheduling Pipelined Multiprocessor Tasks. [Citation Graph (0, 0)][DBLP]
    International Conference on Computational Science (1), 2001, pp:61-70 [Conf]
  3. Ceyda Oguz, Yu-Fai Fung, Muhammet Fikret Ercan, X. T. Qi
    Parallel Genetic Algorithm for a Flow-Shop Problem with Multiprocessor Tasks. [Citation Graph (0, 0)][DBLP]
    International Conference on Computational Science, 2003, pp:548-559 [Conf]
  4. Ceyda Oguz, Yu-Fai Fung, Muhammet Fikret Ercan, X. T. Qi
    Parallel Genetic Algorithm for a Flow-Shop Problem with Multiprocessor Tasks. [Citation Graph (0, 0)][DBLP]
    ICCSA (1), 2003, pp:987-997 [Conf]
  5. Jacek Blazewicz, Beniamin Dziurdza, Wojciech T. Markiewicz, Ceyda Oguz
    The Parallel Genetic Algorithm for Designing DNA Randomizations in a Combinatorial Protein Experiment. [Citation Graph (0, 0)][DBLP]
    PPAM, 2005, pp:1097-1105 [Conf]
  6. Jacek Blazewicz, Fred Glover, Marta Kasprzak, Wojciech T. Markiewicz, Ceyda Oguz, Dietrich Rebholz-Schuhmann, Aleksandra Swiercz
    Dealing with repetitions in sequencing by hybridization. [Citation Graph (0, 0)][DBLP]
    Computational Biology and Chemistry, 2006, v:30, n:5, pp:313-320 [Journal]
  7. T. C. Edwin Cheng, Zhi-Long Chen, Ceyda Oguz
    One-machine batching and sequencing of multiple-type items. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 1994, v:21, n:7, pp:717-721 [Journal]
  8. Ceyda Oguz, Bertrand M. T. Lin, T. C. Edwin Cheng
    Two-stage flowshop scheduling with a common second-stage machine. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 1997, v:24, n:12, pp:1169-1174 [Journal]
  9. W. K. Yeung, Ceyda Oguz, T. C. Edwin Cheng
    Single-machine scheduling with a common due window. [Citation Graph (0, 0)][DBLP]
    Computers & OR, 2001, v:28, n:2, pp:157-175 [Journal]
  10. Ceyda Oguz, Muhammet Fikret Ercan
    A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks. [Citation Graph (0, 0)][DBLP]
    J. Scheduling, 2005, v:8, n:4, pp:323-351 [Journal]
  11. Ceyda Oguz, Yakov Zinder, Van Ha Do, Adam Janiak, Maciej Lichtenstein
    Hybrid flow-shop scheduling problems with multiprocessor task systems. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2004, v:152, n:1, pp:115-131 [Journal]
  12. Ceyda Oguz, Muhammet Fikret Ercan, T. C. Edwin Cheng, Y. F. Fung
    Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. [Citation Graph (0, 0)][DBLP]
    European Journal of Operational Research, 2003, v:149, n:2, pp:390-403 [Journal]
  13. Muhammet Fikret Ercan, Ceyda Oguz
    Performance of local search heuristics on scheduling a class of pipelined multiprocessor tasks. [Citation Graph (0, 0)][DBLP]
    Computers & Electrical Engineering, 2005, v:31, n:8, pp:537-555 [Journal]

Search in 0.054secs, Finished in 0.055secs
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002